Today's modular systems are models of efficiency with quality assurance. The building process begins at the design phase. Most modular producers use state of the art computer assisted design stations which aid them in customizing floor plans and producing drawings and materials requirement list. Once designed, the building process begins. This process is similar to what you've seen during the construction of houses in your neighborhood. The quality materials and care for detail, and the same building codes and standards are observed. So what's different? Efficiency and quality control!
Speed and consistent quality are two of the many advantages for choosing modular components for your new home. On the average, a home consisting of two modules will be factory produced in six or seven days. Once the manufacturing process is complete, typically with interior finish right down to carpets and wall finish, the unit must be transferred to the building site and placed on its foundation. Final completion is usually handled by a local builder or general contractor and includes connection of utilities to the home, and a short list of finish work. Normally the home is completed in 3 to 4 weeks.

Yes. Most modular companies allow the customer complete design flexibility. But remember, every manufacturer is different. Engineering capabilities and product specifications will vary from company to company.